[1]
Shojaie, A.A. and Farshbaf Khalili, N. 2025. Evaluation of Residual Risks in an Oil Construction Project Using Fuzzy SAW and Risk Matrix Methods. Research Annals of Industrial and Systems Engineering. 2, 2 (May 2025), 81–92. DOI:https://doi.org/10.22105/raise.v2i2.46.