(1)
Evaluation of Residual Risks in an Oil Construction Project Using Fuzzy SAW and Risk Matrix Methods. Res. Ann. Ind. Syst. Eng. 2025, 2 (2), 81-92. https://doi.org/10.22105/raise.v2i2.46.