Evaluation of Residual Risks in an Oil Construction Project Using Fuzzy SAW and Risk Matrix Methods.
Research Annals of Industrial and Systems Engineering,
[S. l.], v. 2, n. 2, p. 81–92, 2025.
DOI: 10.22105/raise.v2i2.46. Disponível em: https://www.raise.reapress.com/journal/article/view/46.. Acesso em: 13 jun. 2025.