Shojaie, Amir Abbas, and Navid Farshbaf Khalili. 2025. “Evaluation of Residual Risks in an Oil Construction Project Using Fuzzy SAW and Risk Matrix Methods”. Research Annals of Industrial and Systems Engineering 2 (2): 81-92. https://doi.org/10.22105/raise.v2i2.46.